Buying Guides

Flaring Tool Sample Approval Checklist

Record model, tube and fitting requirements, sample results and approved packaging before a bulk flaring tool order. Includes an approval record.

flaring-tool-sample-approval-checklist
A sample should answer a purchasing question: will the agreed tool configuration meet the buyer's documented application? A good-looking sample or one acceptable flare is not a complete bulk-order approval. Use the following record to separate model selection, application checks and packaging approval.
  1. Freeze the requirement before testing Record the exact model, size system, tube outside diameter, tube material and wall thickness, mating fitting and required flare form. Obtain the applicable tool and fitting instructions. Agree who will assess the sample and what evidence they must provide. Do not treat a catalogue's 45-degree description as approval for every fitting or tube material.
For example, our catalogue lists CT-191A with 3/16, 1/4, 5/16, 3/8, 7/16, 1/2 and 5/8 inch sizes; CT-191M lists 5, 6, 8, 10, 12, 14 and 16 mm. Keep the original units on the approval sheet. An approximate conversion is not an approved substitute. See the model specifications: CT-191A / CT-191M model specifications
  1. Record what arrived Assign a sample reference. Photograph the model identification, size markings, tool and package contents. Compare them with the quotation. Record missing parts, damage or unclear markings as open issues instead of silently accepting a different configuration. Keep the sample reference tied to the supplier quotation revision.
  1. Agree application-specific checks Use the intended tubing and fittings and the manufacturer's instructions. A competent evaluator should record tube grip, operation, repeatability and the condition and dimensions of the finished flare against the agreed requirements. Document failures as well as acceptable results. The number of trials and acceptance limits must be agreed for the application; there is no universal test count supplied by this checklist.
A visual check cannot establish leak-tightness or suitability for service. Any assembly or pressure testing must follow the equipment and fitting manufacturer's requirements and be conducted by qualified personnel. This purchasing record is not an installation procedure or a certification.
  1. Use a written approval record Copy these fields into your purchasing sheet: Sample reference and receipt date: Supplier quotation and revision: Tool model and size system: Tube specification and batch: Fitting specification and required flare: Instructions used and revision: Checks performed and acceptance limits: Results, photographs and unresolved issues: Decision: approved / conditional / rejected: Approved configuration and packaging: Evaluator, approval date and retained-sample location:
If approval is conditional, state exactly which issue must be corrected and whether another sample is required. Keep an agreed reference sample where practical. Approval of one size or configuration should not silently approve every model in a mixed order.
  1. Separate sample approval from shipment release Confirm the ordered model allocation, labels and carton data separately. Our CT-191 catalogue reference is 20 pieces per carton, 17/16 kg gross/net and 34 × 26.5 × 25 cm. Customized packing must be reconfirmed. Before shipment, compare the final packing list with the approved order, rather than relying on sample packaging alone. Prepare the commercial request: flaring tool RFQ specification checklistFor the Longrun CT-191 product and wholesale enquiry: https://www.longrunhardware.com/tube_flaring_tool_kits-24/75.html
Reference and scope Product figures above come from Ningbo Torchmark HVAC Tools Catalogue 2026, page 5. For an independent example of model-specific size and configuration documentation, see RIDGID's 345 tool page: https://www.ridgid.com/sg/en/345-manual-flare-toolThat reference concerns RIDGID products; its material claims and accessories are not specifications for Torchmark tools.
Request a sample plan Send model, tubing and fitting requirements, intended quantity and destination. MOQ is 500 pieces; mixed-order allocation is confirmed in the quotation. Samples are charged, with sample freight refunded after an order is placed. Typical lead time is 15–45 days, subject to the confirmed order. Email: amy@longrunhardware.comWhatsApp: https://wa.me/8615867457689
Author: Alisa Xu — Product Manager 0086-13429254575 LinkedIn: https://www.linkedin.com/in/alisasourcing/What a sample approval is actually for
The checklist above sets out what to check. The purpose behind it is narrower than most buyers assume: a sample approval is not a quality inspection of one tool. It is the agreement of a repeatable acceptance criterion, so that a batch of five thousand can be judged by the same standard as the one tool in your hand.
That distinction matters on flaring tools because most failures are not visible. A flare can look correct — even cone, no split, no crack — and still weep under pressure because it was formed on the nearest available hole rather than the exact tube outside diameter. Only a defined test catches that.

Approval sequence

Stage
What happens
Output
1. Configuration check
Confirm every requested tube size is listed on the model
Model and suffix confirmed
2. Sample request
Specify tube material, wall thickness and sizes to test
Sample shipped
3. Flare test
Make flares on the exact sizes and material
Physical flares for inspection
4. Inspection
Check flare face, seating and contact band
Pass / fail per size
5. Criterion agreed
Write the method into the order
Basis for accepting or rejecting a batch
6. Production
Batch runs against the approved sample
Inspection against the same method
Model configurations and listed sizes are on the CT-203A / CT-203M and CT-103A / CT-103M pages. Where a size is not listed — 25 mm is on CT-103M, not CT-203M — the inch vs metric size guide shows which model to move to.

How to test a flaring tool sample

Test on the real tube, not a convenient offcut

Use the tube material, outside diameter and wall thickness your customers actually install. Soft copper behaves differently from hard drawn, and thin-wall tube splits more readily. A sample approved on the wrong tube approves the wrong thing.

Make several flares, not one

Make at least one flare per listed size you intend to sell, including the smallest and largest. Size-dependent problems appear at the ends of a range, not in the middle.

Inspect the contact band

Look at the flare face for an even, continuous contact band and check that it seats on the fitting without rocking. An uneven band is the signature of a flare formed on a wrong-size clamp.

Four approval mistakes

Approving on one size

A tool that flares 19 mm cleanly may not flare 28 mm cleanly. Cover every size you will sell.

Approving without a written criterion

Without a method there is nothing to reject against. Write the test into the order.

Changing packaging after approval

Printed components have their own lead time. Approve artwork and format at the same time as the tool sample so both run in parallel.

Not checking which clamping set shipped

A and M configurations ship with different clamping components. Verify the suffix on the sample matches the enquiry.

Packaging approval alongside the tool

What needs approving

Logo position and print quality, barcode legibility, instruction language, carton or blister format and spare-part labelling. Each has its own proof cycle.

Why it runs in parallel

If packaging approval starts after tool approval, the printed components become the critical path and the shipment moves out by weeks. Send artwork with the RFQ.

From approval to first container

MOQ and mixed allocation

Ask for the figure that applies to your exact configuration, because packaging format moves it. Mixed allocation across models is usually available, which lets a first container carry more than one configuration.

Reading carton data

CT-203 and CT-103 configurations pack 10 per case at 31.5 × 17 × 14.5 cm; CT-190 packs 20 per case at 27 × 20 × 27 cm. Take freight figures from the approved SKU.

Inspection before shipment

Inspection follows the method agreed at approval. Where the batch passes the same test the sample passed, there is no ambiguity.

Frequently asked questions

How many flares should we make on a sample?

At least one per listed size you intend to sell, including the smallest and largest. Size-dependent problems show at the ends of the range.

Can we approve on a substitute tube size?

No. Approve on the exact outside diameter, material and wall thickness your market uses, because clamp behaviour depends on all three.

What if a size we need is not listed?

Move to the configuration that lists it — 25 mm is on CT-103M rather than CT-203M. Confirm coverage before sampling rather than after.

How long does approval take?

The tool test is quick; printed packaging is the longer item. Send artwork with the RFQ so both run in parallel.

Do we get the sample cost back?

Sample terms are quoted with the enquiry. Ask for them in the same reply as price and MOQ so the total is visible.

What happens if the batch differs from the sample?

The agreed acceptance criterion decides it. That is precisely why the criterion is written into the order at approval rather than at delivery.

Where to go next

Request a quote

Send the tube sizes and material you will test on, the model, packaging format, quantity and destination port. We will return sample terms, price, MOQ and lead time in one reply.
amy@longrunhardware.com · alisa@longrunhardware.com · · WhatsApp +86 158 6745 7689Small trial orders for flaring configurations
If you are adding flare tools to your range, a small trial order covering the tube sizes and cone types you actually stock is enough to check fit and demand. The applicable minimum is confirmed for each item in the quotation.
Send the tube diameters, the 45° SAE or 37° JIC cone you need, and your first-order quantity, and we will confirm the matching configuration, packing and terms per order.

Read next

More from the journal

Keep readers moving through related announcements, stories, and field notes.